Line 8 (Chengdu Metro)
Line 8 of the Chengdu Metro (Chinese: 成都地铁8号线; pinyin: Chéngdū Dìtiě Bā Hào Xiàn) is a line on the metro network in Chengdu, Sichuan, China. The first phase opened on 18 December 2020.[1]
| Line 8 | |
|---|---|
| 8 | |
![]() Line 8 platform at Dongda Road station  | |
| Overview | |
| Status | Operational | 
| Owner | Chengdu | 
| Locale | Chengdu, China | 
| Termini | |
| Stations | 25 | 
| Service | |
| Type | Rapid transit | 
| System | Chengdu Metro | 
| Services | 1 | 
| Operator(s) | Chengdu Metro Limited | 
| History | |
| Opened | 18 December 2020 | 
| Technical | |
| Line length | 29.1 km (18.08 mi) | 
| Number of tracks | 2 | 
| Character | Underground | 
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | 
The line runs from north-east to south-west and avoids the centre of Chengdu.
History
    
- On 11 July 2016, NDRC approved the 3rd phase expansion for the Chengdu Metro, consisting of Line 6 phase 2 and 3, Line 8 Phase 1, Line 9, Line 10 Phase 2, Line 17 Phase 1, and Line 18.[2] The third phase was to be simultaneously built with the already under construction second phase.
 
- On 18 Dec 2020, Line 8 Phase 1 opened along with: Line 6 Phase 1/2/3, Line 9 Phase 1, Line 17 Phase 1, Line 18 Phase 2, marking the completion of all Phase 2 and 3 projects.[5]
 
Opening timeline
    
| Segment | Commencement | Length | Station(s) | Name | 
|---|---|---|---|---|
| Shilidian — Lianhua | 18 December 2020 | 29.1 km (18.08 mi)[8] | 25 | Phase 1 | 
| West Airport Bus Terminal~Lianhua[9] | 2020-May-18 | 1.25 km (0.78 mi) | 1 | Phase 2 | 
| Shilidian~Longtansi East[10] | 2020-May-18 | 6.56 km (4.08 mi) | 6 | Phase 2 | 
Stations
    
| Station
 №  | 
Station name | Transfer | Distance km  | 
Location | ||
|---|---|---|---|---|---|---|
| English | Chinese | |||||
| 08 07 | Shilidian | 十里店 | -- | 0.000 | Chenghua | |
| 08 08 | Chengdu University of Technology | 理工大学 | 7 | 0.832 | 0.832 | |
| 08 09 | Dongjiao Memory | 东郊记忆 | 1.041 | 1.873 | ||
| 08 10 | Shabanqiao | 杉板桥 | 1.053 | 2.926 | ||
| 08 11 | Wannian Road | 万年路 | 1.221 | 4.147 | ||
| 08 12 | Shuangqiao Road | 双桥路 | 4  | 
1.004 | 5.151 | |
| 08 13 | Dongda Road | 东大路 | 2 | 1.564 | 6.715 | Jinjiang | 
| 08 14 | Jingju Temple | 净居寺 | 1.493 | 8.208 | ||
| 08 15 | Dongguang | 东光 | 6 | 0.762 | 8.970 | |
| 08 16 | East Lake Park | 东湖公园 | 0.954 | 9.924 | ||
| 08 17 | Sichuan University Wangjiang Campus | 川大望江校区 | 1.416 | 11.340 | Wuhou | |
| 08 18 | Nijiaqiao | 倪家桥 | 1 | 0.964 | 12.304 | |
| 08 19 | Fangcao Street | 芳草街 | 1.248 | 13.552 | ||
| 08 20 | Yongfeng | 永丰 | 0.625 | 14.177 | ||
| 08 21 | Jiuxing Avenue | 九兴大道 | 5 | 1.224 | 15.401 | |
| 08 22 | Gaopeng Avenue | 高朋大道 | 7  | 
0.606 | 16.007 | |
| 08 23 | Yinjialin | 殷家林 | 1.288 | 17.295 | ||
| 08 24 | Qing'an | 庆安 | 0.841 | 18.136 | ||
| 08 25 | Shiyang | 石羊 | 1.513 | 19.649 | ||
| 08 26 | Sanyuan | 三元 | 9 | 0.645 | 20.294 | |
| 08 27 | Shunfeng | 顺风 | 1.605 | 21.899 | Shuangliu | |
| 08 28 | Zhujiang Road | 珠江路 | 1.438 | 23.337 | ||
| 08 29 | Sichuan University Jiang'an Campus | 川大江安校区 | 1.569 | 24.906 | ||
| 08 30 | Wenxing | 文星 | 1.697 | 26.603 | ||
| 08 31 | Lianhua | 莲花 | 1.320 | 27.923 | ||
References
    
- "China's Chengdu Metro opens five new lines in city". www.railway-technology.com. Retrieved 2020-12-25.
 - 关于成都市城市轨道交通第三期建设规划(2016~2020年)的批复(发改基础〔2016〕1493号). ndrc.gov.cn. Archived from the original on 22 June 2019. Retrieved 2018-08-19.
 - "8号线一期全线"轨通"!还有其他在建线路最新进展!".
 - 新浪网 (2020-08-12). "成都地铁8号线建设最新进展".
 - 中國新聞网 (2020-12-18). "成都地铁新开5条线 运营里程558公里".
 - "成都地铁8号线二期、27号线一期、30号线一期开工 轨道交通第四期建设规划全部开工". sichuan.scol.com.cn.}
 - "成都地铁8号线龙莲盾构区间顺利通过验收".
 - "5条新线车站集中亮相:成都地铁8号线一期 "音乐地铁,国际文创"". 四川新闻网首页. 7 December 2020. Retrieved 25 December 2020.
 - "刚刚!成都地铁8号线二期、27号一期、30号线一期三线开建!_四川在线". sichuan.scol.com.cn. Retrieved 2020-06-14.
 - "刚刚!成都地铁8号线二期、27号一期、30号线一期三线开建!_四川在线". sichuan.scol.com.cn. Retrieved 2020-06-14.
 
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.
